Most sheds in Durham come down with a drill, a pry bar, and two people, and that is the job we do: empty it, take the building apart by hand, and haul the walls, roof, and floor in the same trip. No excavator, no dumpster sitting on your lawn for a week, and no pretending a poured slab is part of it.

Contents and building, one trip

The mower, the shelves, and the shed itself go out together when it fits.

The pad stays

A poured slab is a different trade. We take everything above it.

Three photos price it

Outside, inside, and the path from the shed to where a trailer can park.

What a hand teardown covers

We take down what comes apart with hand and power tools: wood-frame garden sheds, metal kit sheds, resin and vinyl sheds, and the ones that have been leaning for years. Shingles come off, panels unscrew, the frame comes apart in sections, and the floor comes up if it is wood on runners or blocks.

Everything that was inside goes in the same load, so a shed with a dead mower, old fencing, and twenty years of garden tools is one job, not two.

What we leave, and what has to happen first

Some parts of a shed are not ours to take down, and it is better to know that before the day than to find out halfway through.

  • A poured concrete pad or footings. Breaking out a slab is a different contractor, and concrete is fill at the dump, charged at more than double the general rate.
  • Wiring. If there is power to the shed, an electrician disconnects it before we start.
  • Plumbing or a foundation. A shed with water or a real foundation is a building question for your municipality first. We do not pull permits.
  • Suspect siding or roofing. Older sheds sometimes have cement-board panels or roofing that may contain asbestos. If it looks like that, it gets tested before anyone breaks it.
  • Paint, fuel, and propane. They stay off the trailer, the same as on every job, so flag them in the photos.

What decides the price

Taking a building apart is labour first and volume second, which is why a shed teardown is quoted from photos rather than read off a load chart. A small garden shed that comes apart cleanly can still land in an ordinary load price. A big one, or a collapse, usually does not.

  • Size and build. A six-by-eight kit shed unscrews in an hour. A framed ten-by-twelve with a shingled roof is most of a morning.
  • Condition. Rot and a collapsed roof are slower and less predictable than a shed still standing square.
  • Access. A side gate, a slope, or a long carry to the street adds time to every trip with an armful of siding.
  • What is inside. Contents are priced like a small garage cleanout and added to the same visit.

Already torn down? We haul the debris

If you or a contractor did the demolition, the pile left behind is renovation debris, and the curb will not take it anywhere in Durham. The Region does not collect renovation material, and neither Oshawa's nor Whitby's bulky programs take construction debris.

Lumber, shingles, drywall, old fencing, deck boards, and cabinets are ordinary loads for us, priced from photos. Keep concrete, brick, and soil in a separate pile: mixed into the rest, they push the whole load onto the heavier fill rate at the dump.

Region of Durham: renovation material such as lumber, drywall, cabinetry, doors, and carpet is not collected at the curb. Facility rates are $175 per tonne for general waste and $375 per tonne for fill, with $7 minimum under 40 kg.

Verified November 9, 2026 · Durham Region furniture and large-item collection · Durham Region Waste Management Facilities

Port Perry, Uxbridge, and the north

North of Taunton the sheds get bigger and older: farm outbuildings, lean-tos, and garden sheds that came with the property. Those are booked windows rather than same-day, and the load usually tips at the Scugog facility on Reach Street in Port Perry rather than Ritson Road in Oshawa.

The rules do not change at the township line. Same hand teardown, same pad left in place, same published rates for whatever was inside.

Rates

Load sizeBefore HST
Single Item or Minimum Load$109-$169
Small Load (1/4 trailer)$209-$309
Half Load$379-$489
Three-Quarter Load$499-$619
Full Load$629-$799
Multiple Loads$749-$1,500 quoted per trip

Emptying a shed is priced on the loads below, usually a quarter to a half trailer. Taking the building down is labour plus disposal and is quoted from your photos, so the estimate says what it is instead of forcing it into a load size.

Same rates everywhere in Durham Region. Brock Township and Uxbridge add a trip fee on jobs under a half load, for the drive. Full pricing details, or read what actually drives the price.

Included on every job

  • All labour, loading, and carrying - you don't lift anything
  • Disposal and Regional facility tipping fees
  • Fuel, truck, and trailer
  • Sweep-up of the area we cleared
  • Recycling and donation of anything genuinely reusable
  • A price confirmed on-site before we load a single item

Questions we get asked

Emptying a garden shed is usually a quarter to a half trailer, $209 to $489 before HST. Taking the building down is quoted from photos, because it is labour as much as volume: a small kit shed that comes apart cleanly can still land in an ordinary load price, while a large framed or collapsed shed is quoted on its own.
No. We take everything above the slab and leave the pad. Breaking out concrete is a different contractor, and at the dump it is fill, charged at $375 a tonne against $175 for general waste.
Yes, if it comes apart by hand. Collapses are slower and less predictable than a standing shed, so photograph it from a few angles and the quote will allow for it.
We do not pull permits. If the shed has power, plumbing, or a real foundation, check with your municipality before anyone takes it apart, and have an electrician disconnect any wiring first.
Yes. Lumber, shingles, drywall, fencing, deck boards, and cabinets are ordinary loads. Keep concrete, brick, and soil separate, because mixed into the rest they move the whole load onto the heavier fill rate.
Yes. Metal kit sheds unscrew and the steel goes for recycling. Resin and vinyl sheds come apart in panels. Both are usually faster than a framed wood shed of the same size.